| Region | Plant | Capacity (10k tons/year) | Remarks |
|---|---|---|---|
| Jiangsu | Nanjing Chemical | 26 | Unit A (230k t/y) at 80% load; Unit B (100k t/y) with fluctuating load, expected shutdown soon |
| Jiangsu Fuqiang | 10 | Normal operation, planned shutdown on Nov. 5 | |
| Jiangsu Yangnong | 3 | Normal operation | |
| Shandong | Yantai Wanhua | 108 | Normal operation |
| Shandong Jinling | 26 | New Materials: Unit A (100k t/y) shut down Sep. 28–Oct. 22; Unit B (100k t/y) shut down Sep. 28–Oct. 31 | |
| Dawang: Two units under maintenance shutdown | |||
| Shandong Huatai | 10 | Short shutdown Oct. 19–24, currently at 80% load | |
| Dongying Caijin Chemical | 6 | Two units at 80% load | |
| Jilin | Jilin Xuyang Kangnai'er | 36 | Two units rotating for inspection, estimated restart on Nov. 6 |
| Shanxi | Tianji Chemical | 26 | Shutdown for maintenance Oct. 11–30 |
| Chongqing | BASF Chongqing | 30 | Normal operation |
| Chongqing Changfeng | 3.7 | Normal operation | |
| Zhejiang | Ningbo Wanhua | 72 | Normal operation |
| Shanghai | Covestro Shanghai | 40 | Normal operation |
| BASF Shanghai (Lianheng) | 18 | Normal operation | |
| Fujian | Fujian Wanhua | 72 | Normal operation |
Comments
0