| Company | Capacity (10,000 t/yr) | Current Operating Rate | Unit Status |
|---|---|---|---|
| Fushun Petrochemical | 9.2 | 0% | Shut down in early March; restart timing TBD. |
| Jilin Petrochemical | 68.4 | 85% | Load reduced to 50% from mid-April to mid-May. On June 1, one 130,000-t/yr line was shut down for maintenance and resumed in July. At the end of July, the No. 1 AN unit and the A line of the No. 3 AN unit were shut down for maintenance; the No. 3 AN A line resumed on August 18, while the No. 1 AN unit is scheduled to resume in the second half of September. |
| Daqing Petrochemical | 8 | 90% | None at present. |
| Daqing Refining & Chemical | 8 | 100% | None at present. |
| Anqing Petrochemical | 21 | 62% | Load reduced in late January and raised in mid-March. On September 2, an 80,000-t/yr unit was shut down; on September 8, a 130,000-t/yr unit was shut down. The shutdown is expected to last 40–50 days. |
| Shandong Haijiang | 13 | 100% | Shut down for maintenance on December 25, 2025; restarted on February 8, 2026. Brief shutdown due to malfunction on August 19–21. |
| Keluer | 26 | 100% | Shut down for maintenance from April 23; gradually restarted and resumed on June 23. |
| Shanghai SECCO | 52 | 50% | One unit has been in operation since March 2025. One line was under maintenance from May 6 to 21, with load reduced to 25%. |
| Sierbang | 104 | 50% | Operating units reduced from three to two on January 20; restored to three at the end of March; reduced to two in June; reduced to one in July; gradually restored to three in early September. |
| Lanzhou Petrochemical | 3.5 | 90% | None at present. |
| Zhejiang Petrochemical (ZPC) | 52 | 90% | Load reduced in late January and gradually raised in February. One unit was shut down at the end of March; one line resumed in mid-May and the other on June 20. One line was shut down for maintenance due to a malfunction from August 14 to 27. |
| Lihuayi | 26 | 100% | Brief shutdown for repair due to malfunction on July 28; restarted and resumed on August 5. |
| Tianchen Qixiang | 13 | 100% | Load reduced in mid-March; shut down for maintenance in early July; resumed on August 20. |
| Liaoning Kingfa | 26 | 100% | One 130,000-t/yr production line was shut down for maintenance on August 13 and resumed in early September. |
| Jilin Petrochemical (Jieyang) | 13 | 100% | Shut down for maintenance due to malfunction from January 20; restarted on February 10. Brief malfunction shutdown from July 29 to August 3. Maintenance planned for November–December. |
| CNOOC Fudao | 20 | 95% | Shut down for maintenance on March 30; one line resumed at the end of April, and the other resumed in early May. |
| Yulong Petrochemical | 26 | 95% | The second line was successfully started up in early February. |
| Sinochem Quanzhou | 26 | 90% | Full-plant shutdown for maintenance in mid-September 2025; gradually restarted around June 25, 2026. |
| Zhenhai Refining & Chemical | 40 | 50% | Load reduced in late January; reduced to 80% in July and further to 50% from August 10; recovery planned for September 5. |
| Overall Total | 555.1 | 75.8% | — |
Note: Capacity values are in units of 10,000 metric tons per year (万吨/年), as in the original table.