China producers · plant capacity (10kt) · capacity utilization
Latest China snapshot 20261105
Track PTA plant capacity and capacity utilization by producer. Operating rates, shutdowns and restarts that move China supply. Compare with PTA price or browse PTA suppliers.
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | 110.00 | - | Shutdown on April 19, 2026; restart date TBD. |
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024. | ||
| Dongying Weilian Chemical Co., Ltd. | Unit load reduction and shutdown on June 29, 2026; restart and ramp-up in progress as of August 27. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | Restart scheduled for May 9, 2026; currently in shutdown status as of June 30. | ||
| Fujian Billion Petrochemicals Co., Ltd. | Shutdown on November 1, 2026. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | The plant was shut down on June 25, 2026, and restarted in early September. Power supply was restored after a power trip on September 8. In early November, product output and production volume were briefly affected. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | Shutdown on August 16, 2025; restart on June 1, 2026; shutdown again on July 10. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Shutdown on January 6, 2025; | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Shutdown scheduled for May 10, 2026, lasting approximately two weeks; a short shutdown of 4–5 days is planned for May 29. | ||
| Hengli Petrochemical Co., Ltd. | Shutdown on October 9, 2025; restart on October 24, 2025. | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | Shutdown on August 28, 2025. | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | Shutdown on May 23, 2026; Restarted on June 1. Shutdown again on July 3; Restarted on September 1 with capacity ramp-up in progress. Load reduction initiated from late October. | ||
| Jiangsu Jiatong Energy Co., Ltd. | On August 6, 2026, the plant load was reduced to 70–80% due to operational issues; it was restored on August 14. Starting from mid-October, the unit underwent a shutdown for approximately two weeks. | ||
| Jiaxing Petrochemical Co., Ltd. | On March 13, 2026, a five-day short shutdown was implemented due to unforeseen circumstances. The plant was shut down on July 1 and restarted on September 3. Another shutdown occurred around October 6. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | Shutdown on January 25, 2025; | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | Shutdown scheduled for April 15, 2026: Postponed. | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | Shutdown on April 10, 2024; | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | The unit was shut down on July 1, 2026, and restarted on July 25. In early August, the load increased to approximately 90%. It dropped to 80% in early September. The unit was shut down again on September 14 due to an incident. It was restarted on September 23, with product discharge resuming and load being gradually increased. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | Shutdown on August 8, 2025; restart in progress as of July 15, 2026; unplanned shutdown on August 26 due to operational issues, followed by a restart on September 13. | ||
| Zhejiang Dushan Energy Co., Ltd. | Shutdown on May 16, 2026; restart on June 15. Reduced to 70% capacity from August 4–14 due to operational issues. Short shutdown occurred on September 22 due to unforeseen circumstances, followed by repairs and restoration of operations. | ||
| Zhejiang Yisheng New Materials Co., Ltd. | The plant was temporarily shut down on February 24, 2026, due to unforeseen circumstances. It resumed load ramp-up on February 25, 2026, and returned to full operation in early March. Load reduction began on March 12. On April 2, the load was reduced by 30%. As of August 14, the load is being increased. |
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | Shutdown on April 19, 2026; restart date to be determined. | ||
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024 | ||
| Dongying Weilian Chemical Co., Ltd. | On June 29, 2026, the plant was shut down following a load reduction. As of August 27, it has been restarted and is currently undergoing ramp-up to increase production load. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | Restart on May 9, 2026; currently in shutdown as of June 30. | ||
| Fujian Billion Petrochemicals Co., Ltd. | Operating rates dropped to 90% on March 16, 2026, and further declined to 60–70% by March 31, before recovering. A minor reduction in operating load was implemented for approximately 10 days starting September 3. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | The unit was reduced to 50% capacity on March 16, 2026; shut down on June 25; and restarted in early September. It resumed operations following a power trip on September 8. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | Shutdown on August 16, 2025; restart on June 1, 2026; shutdown again on July 10. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Shutdown on January 6, 2025. | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Shutdown scheduled for May 10, 2026, lasting approximately two weeks; short shutdown of 4–5 days on May 29. | ||
| Hengli Petrochemical Co., Ltd. | Shutdown on October 9, 2025; restart on October 24, 2025. | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | Shutdown on August 28, 2025 | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | On May 23, 2026, the unit was shut down; it was restarted on June 1. On July 3, the unit was taken offline again, and it is currently being restarted with increasing load since September 1. | ||
| Jiangsu Jiatong Energy Co., Ltd. | On August 6, 2026, the plant load was reduced to 70–80% due to operational issues. The load was increased again on August 14. From mid-October onward, the unit was shut down for approximately two weeks. | ||
| Jiaxing Petrochemical Co., Ltd. | A 5-day unplanned short shutdown occurred on March 13, 2026. The plant was shut down on July 1 and restarted on September 3. Another shutdown took place around October 6. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | Shutdown on January 25, 2025; | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | Shutdown scheduled for April 15, 2026: Postponed | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | Shutdown on April 10, 2024. | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | The plant was shut down on July 1, 2026, and restarted on July 25. By early August, the load was ramped up to approximately 90%. In early September, the load was reduced to 80%. The plant was shut down again on September 14 due to an incident. It was restarted on September 23 and is currently ramping up the load while producing product. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | Shutdown on August 8, 2025; Restart in progress on July 15, 2026; Shutdown again on August 26 due to unforeseen circumstances; Restarted on September 13. | ||
| Zhejiang Dushan Energy Co., Ltd. | Shutdown on May 16, 2026; restart on June 15, 2026. Reduced to 70% load capacity from August 4–14 due to operational issues. Short shutdown and subsequent repair completed on September 22 due to unforeseen circumstances. | ||
| Zhejiang Yisheng New Materials Co., Ltd. | The plant was temporarily shut down on February 24, 2026, due to unforeseen circumstances. It resumed load-up operations on February 25 and returned to full capacity in early March. Load reduction commenced on March 12. On April 2, the operating load was reduced by 30%. As of August 14, the unit is undergoing a ramp-up. |
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | Shutdown scheduled for April 19, 2026; restart date to be determined. | ||
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024 | ||
| Dongying Weilian Chemical Co., Ltd. | Load reduction and shutdown on June 29, 2026; restart and ramp-up in progress as of August 27. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | Restart scheduled for May 9, 2026; shutdown in progress as of June 30. | ||
| Fujian Billion Petrochemicals Co., Ltd. | The operating rate was reduced to 90% on March 16, 2026, and further decreased to 60–70% by March 31, 2026, before recovering. A minor reduction in load lasting approximately 10 days occurred around September 3, 2026. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | The plant was reduced to 50% capacity on March 16, 2026; shut down completely on June 25, 2026; and restarted in early September 2026. Operations resumed following a power trip incident on September 8, 2026. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | Shutdown on August 16, 2025; restart on June 1, 2026; shutdown again on July 10. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Shutdown on January 6, 2025 | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Shutdown scheduled for May 10, 2026, lasting approximately two weeks; a short shutdown of 4–5 days is planned for May 29. | ||
| Hengli Petrochemical Co., Ltd. | Shutdown on October 9, 2025; restart on October 24, 2025. | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | Shutdown on August 28, 2025 | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | May 23, 2026: Shutdown; June 1, 2026: Restart; July 3, 2026: Shutdown; September 1, 2026: Restart and ramp-up in progress. | ||
| Jiangsu Jiatong Energy Co., Ltd. | Shutdown on April 25, 2025; restart on May 8. Due to operational issues, the load was reduced to 70–80% on August 6 and restored on August 14. A two-week maintenance shutdown is scheduled to commence on October 14. | ||
| Jiaxing Petrochemical Co., Ltd. | Short shutdown for 5 days on March 13, 2026, due to unforeseen circumstances; plant stopped on July 1 and restarted on September 3; another shutdown occurred around October 6. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | Shutdown on January 25, 2025 | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | The shutdown scheduled for April 15, 2026, has been postponed. | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | Shutdown on April 10, 2024; | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | The plant was shut down on July 1, 2026, and restarted on July 25. By early August, the load increased to approximately 90%. In early September, the load decreased to 80%. The plant was shut down again on September 14 due to an unforeseen incident. It was restarted on September 23, with product discharge ongoing and load ramping up. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | Shutdown on August 8, 2025; restart in progress as of July 15, 2026; unplanned shutdown on August 26 due to operational issues, followed by a restart on September 13. | ||
| Zhejiang Dushan Energy Co., Ltd. | The plant was shut down on May 16, 2026, and restarted on June 15. On August 4, production was reduced to 70% capacity due to operational issues; output was restored on August 14. A short shutdown occurred on September 22 due to unforeseen circumstances, followed by repairs and resumption of operations. | ||
| Zhejiang Yisheng New Materials Co., Ltd. | On February 24, 2026, the unit was temporarily shut down due to unforeseen circumstances. Load recovery commenced on February 25, with full operational capacity restored by early March. Starting March 12, the load was reduced. On April 2, the load was further decreased by 30%. As of August 14, the unit is in the process of ramping up its load. |
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | The combined capacity is 1.10 million tons and 1.25 million tons. The 1.10 million ton/year unit will shut down on April 19, 2026, with the restart date to be determined (TBD). The 1.25 million ton/year unit will shut down in mid-January 2026 and restart on February 28; it also underwent a short shutdown for repairs on September 24. | ||
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024. | ||
| Dongying Weilian Chemical Co., Ltd. | The unit was shut down for reduced load on June 29, 2026, and is currently being restarted and ramped up as of August 27. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | The total capacity is 1.2 million tons and 1.5 million tons. The 1.2-million-ton unit was restarted on May 9, 2026, and shut down for maintenance by June 30. The 1.5-million-ton unit was shut down on May 10, 2026, and restarted on June 12. On August 6, the unit’s load was reduced to 85% due to operational issues; it began recovering on August 13 and underwent a temporary one-day shutdown on August 14. | ||
| Fujian Billion Petrochemicals Co., Ltd. | The operating rate was reduced to 90% on March 16, 2026, and further decreased to 60–70% by March 31, before subsequently recovering. On September 3, a minor reduction in load was implemented for approximately 10 days. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | Capacity reduced to 50% on March 16, 2026; plant shutdown on June 25; restart in early September. Power trip occurred on September 8, followed by recovery. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | The total capacity is 2.0 million tons and 2.5 million tons. The 2.0 million ton unit was shut down on August 16, 2025, restarted on June 1, 2026, and then shut down again on July 10. The 2.5 million ton unit was shut down on June 4, 2026, restarted on July 5, and has recently undergone a slight reduction in load. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Unit shutdown on January 6, 2025. | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Two units, each with a capacity of 2.5 million tons per year. Unit 1: - Shutdown on May 10, 2026, for approximately two weeks. - Short shutdown from May 29 to June 3, 2026 (4–5 days). Unit 2: - Load reduction starting September 20, 2025. - Short shutdown in early August 2025 (a few days), followed by resumption of operations. | ||
| Hengli Petrochemical Co., Ltd. | The plant comprises five units: 1. **2.2 MTPA unit:** Shut down on October 9, 2025, and restarted on October 24, 2025. 2. **2.2 MTPA unit:** Shut down in mid-June 2025 and restored by the end of June; subsequently underwent load reduction and shutdown starting September 2, 2025, before being restored. 3. **2.2 MTPA unit:** Scheduled for shutdown on April 20, 2026. 4. **2.5 MTPA unit:** Shut down on April 9, 2026, with restart planned for late April 2026. 5. **2.5 MTPA unit:** Shut down on April 25, 2026, with restart planned for early-to-mid June 2026. | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | The facility comprises three units: 1. **1.2 million tons/year unit**: Shut down on August 28, 2025. 2. **1.2 million tons/year unit**: Shut down on July 2, 2023; restarted on September 28, 2023; and shut down again on October 7, 2023. 3. **3.2 million tons/year unit**: Shut down on April 22, 2026; restarted on September 20, 2026, and currently undergoing load ramp-up. | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | Both units have a capacity of 2.5 million tons each. Unit 1 was shut down on May 23, 2026, and restarted on June 1; it was subsequently shut down again on July 3 and restarted on September 1, with its load currently being ramped up. Unit 2 was shut down on July 1, 2026, and began product discharge on August 26, with its load also currently being increased. | ||
| Jiangsu Jiatong Energy Co., Ltd. | Two units, each with a capacity of 3 million tons per year. **Unit 1:** - Shut down on April 25, 2025; restarted on May 8, 2025. - Reduced load to 70–80% on August 6, 2025, due to operational issues; restored to full load on August 14, 2025. - Currently undergoing production reduction and shutdown as of October 14, 2025. **Unit 2:** - Scheduled for shutdown on May 20, 2026; planned restart on June 3, 2026. - Load reduced to 70–80% on August 6, 2026, due to operational issues; restored to full load on August 14, 2026. | ||
| Jiaxing Petrochemical Co., Ltd. | The combined capacity totals 1.5 million tons and 2.2 million tons. The 1.5 Mt/a unit experienced a 5-day short shutdown on March 13, 2026, due to an incident; it was shut down on July 1 and restarted on September 3, followed by another shutdown around October 6. The 2.2 Mt/a unit was shut down on May 5, 2026, and is currently undergoing restart as of May 15. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | Total capacity of 2 million tons (shut down on January 25, 2025) and 2.2 million tons (shut down on November 20, 2025; restarted on December 24, 2025). | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | Shutdown scheduled for April 15, 2026, has been postponed. | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | The total capacity amounts to 650,000 tons and 3 million tons. The 650,000-ton/year unit was shut down on April 10, 2024. The 3-million-ton/year unit was shut down on March 3, 2026, and restarted on March 20; it subsequently operated at 70–80% of its rated capacity from late July to early August, after which it has largely returned to normal operation. | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | Shutdown on July 1, 2026; restart on July 25. In early August, the load increased to approximately 90%. In early September, it dropped to 80%. On September 14, the unit was shut down due to an incident. It restarted on September 23 and is currently ramping up production. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | A total capacity of 2.25 million tons and 3.75 million tons. The 2.25-million-ton-per-year unit was shut down on August 8, 2025; restarted on July 15, 2026; shut down again due to operational issues on August 26, 2026; and restarted on September 13, 2026. The 3.75-million-ton-per-year unit was reduced in load (de-rated) on October 31, 2025, and restored to full load (re-loaded) on November 6, 2025; it underwent technical retrofitting on August 1, 2026. | ||
| Zhejiang Dushan Energy Co., Ltd. | The facility comprises four units: 1. **2.5 million tons/year unit**: Shut down on May 16, 2026; restarted on June 15, 2026; reduced to 70% load on August 4, 2026 due to operational issues; load increased on August 14, 2026; experienced a short shutdown on September 22, 2026 due to operational issues, followed by restoration. 2. **2.5 million tons/year unit**: Shut down on February 10, 2026; restarted on February 28, 2026; shut down again on August 1, 2026 due to operational issues; restarted on August 23, 2026. 3. **3.0 million tons/year unit**: Reduced load on June 12, 2026; shut down on June 24, 2026; undergoing restart as of July 24, 2026; reduced to 70% load on August 4, 2026 due to operational issues; load increased on August 14, 2026. 4. **3.0 million tons/year unit**: Shut down on April 14, 2026; restarted on May 9, 2026; reduced to 70% load on August 4, 2026 due to operational issues; load increased on August 14, 2026; shut down in early October 2026. | ||
| Zhejiang Yisheng New Materials Co., Ltd. | Each of the two units has a capacity of 3.6 million tons/year. Unit A was temporarily shut down on February 24, 2026, due to an incident; it resumed operations with load ramp-up on February 25, 2026, and returned to full operation in early March. Starting March 12, 2026, it began reducing load; by April 2, 2026, the load had been reduced by 30%. As of August 14, 2026, it is in the process of increasing load. Unit B was shut down on January 14, 2026, and restarted with load ramp-up on February 25, 2026. By April 2, 2026, its load had also been reduced by 30%. As of August 14, 2026, it is likewise in the process of increasing load. |
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | Unit 1.1 million tons/year: Shut down on April 19, 2026; restart date TBD. Unit 1.25 million tons/year: Shut down in January 2026, restarted on February 28; brief shutdown occurred on September 24 for repairs. | ||
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024 | ||
| Dongying Weilian Chemical Co., Ltd. | The plant was shut down on June 29, 2026, due to load reduction. It was restarted on August 27 and is currently undergoing a gradual increase in production load. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | 1.2 MTPA Unit: Restarted on May 9, 2026; currently shut down as of June 30, 2026. 1.5 MTPA Unit: Shut down on May 10, 2026; restarted on June 12, 2026. On August 6, the unit was reduced to 85% load due to operational issues. Load restoration is in progress as of August 13. A temporary shutdown occurred on August 14 for one day. | ||
| Fujian Billion Petrochemicals Co., Ltd. | The operating rate is expected to decline to 90% by March 16, 2026, and further drop to 60–70% by March 31, before recovering. A minor reduction in load will occur around September 3, lasting approximately 10 days. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | Utilization reduced to 50% on March 16, 2026; plant shut down on June 25; restart scheduled for early September; power trip occurred on September 8, with subsequent restoration. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | 2 million ton/year unit: Shut down on August 16, 2025; restarted on June 1, 2026; shut down again on July 10. 2.5 million ton/year unit: Shut down on June 4, 2026; restarted on July 5. Recently operating at slightly reduced load. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Shutdown on January 6, 2025 | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Here is the professional translation for chemical engineering contexts: **2.5 MTPA Unit:** * **Shutdown:** May 10, 2026 (duration: approx. 2 weeks). * **Short Shutdown:** May 29, 2026 (duration: 4–5 days). **Another 2.5 MTPA Unit:** * **Load Reduction:** September 20, 2025. * **Short Shutdown & Restart:** August 5, 2025 (duration: a few days; unit restored to normal operation after this period). | ||
| Hengli Petrochemical Co., Ltd. | The facility comprises multiple units: - 2.2 million tons/year unit: Shutdown on October 9, 2025; restarted on October 24, 2025. - 2.2 million tons/year unit: Shutdown in mid-June 2025; restored by late June 2025; after a load-reduction shutdown starting September 2, 2025, it was subsequently restored. - 2.2 million tons/year unit: Scheduled for shutdown on April 20, 2026. - 2.5 million tons/year unit: Shutdown on April 9, 2026; planned restart in late April 2026. - 2.5 million tons/year unit: Shutdown on April 25, 2026; planned restart in early-to-mid June 2026. | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | Here is the professional translation: **1.2 MTPA Unit:** Shut down on August 28, 2025. **Another 1.2 MTPA Unit:** Shut down on July 2, 2023; restarted on September 28, 2023; shut down again on October 7, 2023. **3.2 MTPA Unit:** Shut down on April 22, 2026; restarted on September 20, 2026, and currently ramping up to target capacity. | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | Unit 1 (2.5 million tons/year capacity): Shut down on May 23, 2026; restarted on June 1. Shut down again on July 3; restarting with load ramp-up in progress as of September 1. Unit 2 (2.5 million tons/year capacity): Shut down on July 1, 2026; product discharge commenced on August 26; currently undergoing load ramp-up. | ||
| Jiangsu Jiatong Energy Co., Ltd. | **3.0 MTPA Unit:** - Shut down on April 25, 2025; restarted on May 8, 2025. - Load reduced to 70–80% due to operational issues on August 6, 2025. - Load increased on August 14, 2025. - Currently undergoing production curtailment and shutdown since October 14, 2025. **Another 3.0 MTPA Unit:** - Shut down on May 20, 2026; restarted on June 3, 2026. - Load reduced to 70–80% due to operational issues on August 6, 2026. - Load increased on August 14, 2026. | ||
| Jiaxing Petrochemical Co., Ltd. | 1.5 Million Ton Plant: A 5-day unplanned short shutdown occurred on March 13, 2026; the plant was shut down on July 1 and restarted on September 3; another shutdown is scheduled around October 6. 2.2 Million Ton Plant: The plant was shut down on May 5, 2026, and is currently undergoing restart procedures as of May 15. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | 2.0 MTPA unit: Shut down on January 25, 2025; 2.2 MTPA unit: Shut down on November 20, 2025, and restarted on December 24, 2025. | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | Shutdown scheduled for April 15, 2026 has been postponed. | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | 650,000-ton-per-year unit: Shut down on April 10, 2024. 3,000,000-ton-per-year unit: Shut down on March 3, 2026; restarted on March 20, 2026. From late July to early August, the operating rate dropped to 70–80% of capacity, after which it essentially returned to normal levels. | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | Shutdown on July 1, 2026; restart on July 25. Load increased to approximately 90% in early August; reduced to 80% in early September. Shutdown due to an incident on September 14; restarted on September 23, with product discharge ongoing and load ramping up. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | Here is the professional translation of the provided information: **2.25 Million Tons Per Annum (MTPA) Unit:** * Shut down on August 8, 2025. * Restarted on July 15, 2026. * Shut down again on August 26, 2026, due to unforeseen circumstances; restarted on September 13, 2026. **3.75 Million Tons Per Annum (MTPA) Unit:** * Reduced load on October 31, 2025; restored load on November 6, 2025. * Technical retrofit scheduled for August 1, 2026. | ||
| Zhejiang Dushan Energy Co., Ltd. | Here is the professional English translation of the provided operational schedule for the chemical plants: **2.5 Million Ton Plant (Unit 1):** * **Shutdown:** May 16, 2026 * **Restart:** June 15, 2026 * **Load Reduction:** Reduced to 70% capacity on August 4 due to technical issues; load increased back to normal on August 14. * **Short Shutdown & Repair:** Short shutdown occurred on September 22 due to issues, followed by repairs and restart. **2.5 Million Ton Plant (Unit 2):** * **Shutdown:** February 10, 2026 * **Restart:** February 28, 2026 * **Shutdown:** August 1, 2026 due to technical issues * **Restart:** August 23, 2026 **3.0 Million Ton Plant (Unit 1):** * **Load Reduction:** Started reducing load on June 12, 2026 * **Shutdown:** June 24, 2026 * **Restart Process:** Restart initiated on July 24, 2026 * **Load Reduction:** Reduced to 70% capacity on August 4 due to technical issues; load increased back to normal on August 14. **3.0 Million Ton Plant (Unit 2):** * **Shutdown:** April 14, 2026 * **Restart:** May 9, 2026 * **Load Reduction:** Reduced to 70% capacity on August 4 due to technical issues; load increased back to normal on August 14. * **Shutdown:** Scheduled/Planned for early October 2026 | ||
| Zhejiang Yisheng New Materials Co., Ltd. | 3.6 million ton/year unit: Temporarily shut down on February 24, 2026, due to unforeseen circumstances; resumed load ramp-up on February 25 and returned to full operation in early March. Load reduction commenced on March 12; reduced by 30% on April 2; currently undergoing load increase as of August 14. Another 3.6 million ton/year unit: Shut down on January 14, 2026; restarted with ongoing load ramp-up as of February 25. Reduced by 30% on April 2; currently undergoing load increase as of August 14. |
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | Shutdown scheduled for April 19, 2026; restart date TBD. Shutdown occurred in mid-January 2026, with restart on February 28. Short shutdown on September 24, followed by repairs. | ||
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024 | ||
| Dongying Weilian Chemical Co., Ltd. | The unit was shut down on June 29, 2026, following a load reduction. It was restarted on August 27, 2026, and is currently undergoing ramp-up to increase the operating load. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | Here is the professional translation of the operational status: **Unit 1:** * Restarted on May 9, 2026; currently undergoing shutdown as of June 30, 2026. **Unit 2:** * Shut down on May 10, 2026; restarted on June 12, 2026. **Operational Adjustment (August):** * On August 6, the unit load was reduced to 85% due to unforeseen circumstances. * Load restoration began on August 13. * A temporary one-day shutdown occurred on August 14. | ||
| Fujian Billion Petrochemicals Co., Ltd. | Utilization rate will drop to 90% on March 16, 2026, and further decline to 60-70% by March 31, 2026, before recovering. A minor reduction in load (approximately 10 days) is expected around September 3, 2026. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | Utilization was reduced to 50% on March 16, 2026; the plant was shut down on June 25 and restarted in early September. Operations resumed following a power trip on September 8. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | The plant was shut down on August 16, 2025, and restarted on June 1, 2026. It was subsequently shut down again on July 10 [year unspecified, assumed 2026 based on context]. On June 4, 2026, the unit was taken offline and restarted on July 5, 2026. Recently, the operating load has been slightly reduced. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Shutdown on January 6, 2025 | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Here is the translation into professional English: - **May 10, 2026**: Plant shutdown for approximately two weeks. - **May 29, 2026**: Short-term outage lasting 4–5 days. - **September 20, 2025**: Load reduction initiated. - **August 5, 2025**: Brief outage followed by resumption of operations. | ||
| Hengli Petrochemical Co., Ltd. | The plant will undergo a shutdown on October 9, 2025, with restart scheduled for October 24, 2025. Another shutdown is planned for mid-June 2025, with restoration by the end of June 2025. A load reduction leading to a temporary shutdown will occur starting September 2, 2025, followed by restoration. Additional shutdowns are scheduled as follows: April 20, 2026; April 9, 2026 (with restart later that month); and April 25, 2026 (with restart in early-to-mid June 2026). | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | Here is the professional translation of the operational status: - **August 28, 2025**: Plant shutdown. - **July 2, 2023**: Plant shutdown; **September 28, 2023**: Restarted; **October 7, 2023**: Shut down again. - **April 22, 2026**: Plant shutdown; **September 20, 2026**: Restarted and currently ramping up load. | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | Shutdown on May 23, 2026; restart on June 1. Shutdown on July 3; restart and load ramp-up in progress as of September 1. Shutdown on July 1, 2026; product discharge on August 26; load increase ongoing. | ||
| Jiangsu Jiatong Energy Co., Ltd. | Shut down on April 25, 2025; restarted on May 8. On August 6, load was reduced to 70–80% due to operational issues; restored to full capacity on August 14. Production cut and plant shut down starting October 14. Shut down again on May 20, 2026; restarted on June 3. On August 6, load was reduced to 70–80% due to operational issues; restored to full capacity on August 14. | ||
| Jiaxing Petrochemical Co., Ltd. | Here is the professional English translation for chemical industry operations: - **March 13, 2026**: A 5-day unplanned short shutdown due to operational issues. - **July 1, 2026**: Plant shut down; **September 3, 2026**: Restarted. - **Around October 6, 2026**: Plant shut down. - **May 5, 2026**: Plant shut down; **May 15, 2026**: In restart process. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | Shutdown on January 25, 2025; Shutdown on November 20, 2025, and Restart on December 24, 2025. | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | Shutdown scheduled for April 15, 2026, has been postponed. | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | Shutdown on April 10, 2024; shutdown again on March 3, 2026, with restart on March 20. By late July to early August, operating rates dropped to 70–80% and then largely recovered. | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | Shutdown on July 1, 2026; restart on July 25. In early August, the load increased to approximately 90%. By early September, it dropped to around 80%. On September 14, an unplanned shutdown occurred due to a technical issue. Restarted on September 23, with product discharge resumed and load ramping up. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | Shutdown on August 8, 2025; Restarting on July 15, 2026; Shutdown due to unforeseen circumstances on August 26, followed by a restart on September 13. Load reduction initiated on October 31, 2025, with load restoration completed on November 6. Technical retrofit scheduled for August 1, 2026. | ||
| Zhejiang Dushan Energy Co., Ltd. | The unit was shut down on May 16, 2026, and restarted on June 15, 2026. On August 4, the load was reduced to 70% due to operational issues, followed by a ramp-up on August 14. A short shutdown occurred on September 22 for repairs. In February 2026, the unit was shut down on February 10 and restarted on February 28. Another unplanned shutdown occurred on August 1, with restart completed on August 23. Regarding June 2026 operations: Load reduction began on June 12, leading to a full shutdown on June 24; the unit is currently in the process of restarting as of July 24. On August 4, the load was again reduced to 70% due to operational issues, followed by a ramp-up on August 14. Additionally, the unit was shut down on April 14, 2026, and restarted on May 9, 2026. On August 4, the load was reduced to 70% due to operational issues, with a subsequent ramp-up on August 14. The unit was finally shut down in early October 2026. | ||
| Zhejiang Yisheng New Materials Co., Ltd. | On February 24, 2026, the plant was temporarily shut down due to unforeseen circumstances. On February 25, load ramp-up resumed, with full recovery achieved in early March. Load reduction began on March 12. On April 2, the operating load was reduced by 30%. As of August 14, the plant is undergoing a load increase. Separately, the unit was shut down on January 14, 2026. Restart and load ramp-up commenced on February 25. On April 2, the operating load was reduced by 30%. As of August 14, the unit is currently increasing its load. |
| Producer | Plant capacity (10kt) | Utilization % | Remark |
|---|---|---|---|
| BP Zhuhai Chemical Co., Ltd. | The 1.1 million ton per annum (MTPA) unit will be shut down on April 19, 2026, with the restart date to be determined. The 1.25 MTPA unit was taken offline in mid-January 2026 and restarted on February 28; it underwent a brief shutdown on September 24 for repairs. | ||
| Chongqing Pengwei Petrochemical Co., Ltd. | Shutdown on August 29, 2024. | ||
| Dongying Weilian Chemical Co., Ltd. | Unit load reduced and shut down on June 29, 2026; restarted on August 27, 2026, with load ramp-up in progress. | ||
| Formosa Chemicals Industries (Ningbo) Co., Ltd. | The 1.2 million tons/year unit was restarted on May 9, 2026, and is currently shut down as of June 30. The 1.5 million tons/year unit was shut down on May 10, 2026, and restarted on June 12; it reduced its load to 85% due to an issue on August 6, restored normal operations on August 13, and experienced a one-day temporary shutdown on August 14. | ||
| Fujian Billion Petrochemicals Co., Ltd. | Operating rates dropped to 90% on March 16, 2026, and further declined to 60–70% by March 31, before recovering. A minor reduction in load was implemented around September 3 for approximately 10 days. | ||
| Fujian Fuhai Chuang Petrochemical Co., Ltd. | The plant was reduced to 50% capacity on March 16, 2026, and shut down on June 25. It restarted in early September but experienced a power trip on September 8, after which operations were restored. | ||
| Hainan Yisheng Petrochemical Co., Ltd. | The 2.0 million tons/year unit was shut down on August 16, 2025, restarted on June 1, 2026, and subsequently shut down again on July 10, 2026. The 2.5 million tons/year unit was shut down on June 4, 2026, restarted on July 5, 2026, and has recently undergone a slight reduction in operating load. | ||
| Hanbang (Jiangyin) Petrochemical Co., Ltd. | Shutdown on January 6, 2025. | ||
| Hengli Petrochemical (Huizhou) Co., Ltd. | Two 2.5 million ton/year units: - Unit 1: Scheduled shutdown on May 10, 2026, for approximately two weeks; followed by a short shutdown of 4–5 days starting May 29, 2026. - Unit 2: Load reduction initiated on September 20, 2025; preceded by a short shutdown of several days starting August 5, 2025, after which the unit returned to normal operation. | ||
| Hengli Petrochemical Co., Ltd. | The total capacity of the four units is 11.6 million tons (2.2 + 2.2 + 2.2 + 2.5 + 2.5 million tons). Specific operational statuses are as follows: - One 2.2-million-ton unit was shut down on October 9, 2025, and restarted on October 24, 2025. - Another 2.2-million-ton unit was shut down in mid-June 2025, restored by late June 2025, and subsequently underwent a load reduction shutdown starting September 2, 2025, followed by restoration. - The third 2.2-million-ton unit will be shut down on April 20, 2026. - The fourth 2.5-million-ton unit will be shut down on April 9, 2026, with restart scheduled for later that month. - The fifth 2.5-million-ton unit will be shut down on April 25, 2026, with restart expected in early-to-mid June 2026. | ||
| Jiangsu Hailun Petrochemical Co., Ltd. | The total capacity of the three units is 5.6 million tons (1.2 + 1.2 + 3.2 million tons). Their specific operational statuses are as follows: - Unit 1 (1.2 million tons/year): Shut down on August 28, 2025. - Unit 2 (1.2 million tons/year): Shut down on July 2, 2023; restarted on September 28, 2023; and shut down again on October 7, 2023. - Unit 3 (3.2 million tons/year): Shut down on April 22, 2026; restarted on September 20, 2026, and currently ramping up to full load. | ||
| Jiangsu Honggang Petrochemical Co., Ltd. | Two 2.5 million ton/year units: One unit was shut down on May 23, 2026, and restarted on June 1; it was subsequently shut down again on July 3 and is currently undergoing load ramp-up following its restart on September 1. The other unit was shut down on July 1, 2026, began product discharge on August 26, and is also in the process of increasing its operating load. | ||
| Jiangsu Jiatong Energy Co., Ltd. | Two 3.0 million tonne/year units: - **Unit 1**: Shut down on April 25, 2025; restarted on May 8, 2025. Due to operational issues, load was reduced to 70–80% on August 6, 2025, and restored to full capacity on August 14, 2025. The unit is currently undergoing a planned production reduction shutdown as of October 14, 2025. - **Unit 2**: Shut down on May 20, 2026; restarted on June 3, 2026. Due to operational issues, load was reduced to 70–80% on August 6, 2026, and restored to full capacity on August 14, 2026. | ||
| Jiaxing Petrochemical Co., Ltd. | The 1.5 million ton/year unit experienced a 5-day unplanned short shutdown on March 13, 2026; it was shut down on July 1 and restarted on September 3, followed by another shutdown around October 6. The 2.2 million ton/year unit was shut down on May 5, 2026, and is currently undergoing restart as of May 15. | ||
| Ningbo Yisheng Petrochemical Co., Ltd. | The 2.0 million tons per annum (MTPA) unit was shut down on January 25, 2025; the 2.2 MTPA unit was shut down on November 20, 2025, and restarted on December 24, 2025. | ||
| Sichuan Provincial Energy Investment Group Co., Ltd. | Shutdown scheduled for April 15, 2026, has been postponed. | ||
| Sinopec Yizheng Chemical Fibre Co., Ltd. | The 650,000-ton/year unit was shut down on April 10, 2024. The 3,000,000-ton/year unit was shut down on March 3, 2026, and restarted on March 20; from late July to early August, its operating rate dropped to 70–80% before largely recovering. | ||
| Xinjiang Zhongtai Chemical Co., Ltd. | The unit was shut down on July 1, 2026, and restarted on July 25. By early August, the load increased to approximately 90%. In early September, the load decreased to around 80%. The unit was shut down again on September 14 due to an unforeseen issue. It was successfully restarted on September 23, with product output resuming and the load currently being ramped up. | ||
| Yisheng Dahua Petrochemical Co., Ltd. | The 2.25 million tonne/year (MTPA) unit shut down on August 8, 2025; it was restarted in July 2026, but shut down again due to an issue on August 26, 2026, and subsequently restarted on September 13, 2026. The 3.75 MTPA unit underwent load reduction on October 31, 2025, followed by load restoration on November 6, 2025. Technical modifications were implemented on the 3.75 MTPA unit on August 1, 2026. | ||
| Zhejiang Dushan Energy Co., Ltd. | The total capacity of the four units is 11 million tons per year (2.5 + 2.5 + 3.0 + 3.0 Mt/a). Their operational statuses are as follows: **Unit 1 (2.5 Mt/a):** * Shut down on May 16, 2026; restarted on June 15, 2026. * Reduced to 70% load on August 4, 2026, due to an issue. * Load restored on August 14, 2026. * Brief shutdown on September 22, 2026, due to an issue; subsequently repaired and returned to service. **Unit 2 (2.5 Mt/a):** * Shut down on February 10, 2026; restarted on February 28, 2026. * Shut down on August 1, 2026, due to an issue; restarted on August 23, 2026. **Unit 3 (3.0 Mt/a):** * Load reduced on June 12, 2026; shut down on June 24, 2026; restart initiated on July 24, 2026. * Reduced to 70% load on August 4, 2026, due to an issue. * Load restored on August 14, 2026. **Unit 4 (3.0 Mt/a):** * Shut down on April 14, 2026; restarted on May 9, 2026. * Reduced to 70% load on August 4, 2026, due to an issue; load restored on August 14, 2026. * Shut down in early October 2026. | ||
| Zhejiang Yisheng New Materials Co., Ltd. | Two 3.6 million ton/year units: * **Unit 1:** Temporarily shut down on February 24, 2026, due to unforeseen circumstances; restarted and ramped up on February 25, 2026, with full operation restored in early March. Load reduction began on March 12, 2026. On April 2, 2026, the unit was reduced to 70% capacity (i.e., a 30% load reduction). As of August 14, 2026, the unit is undergoing capacity increase. * **Unit 2:** Shut down on January 14, 2026; restarted and ramping up as of February 25, 2026. On April 2, 2026, the unit was reduced to 70% capacity (i.e., a 30% load reduction). As of August 14, 2026, the unit is undergoing capacity increase. |