Get the ChemPriceHub app — track prices on the go. Membership syncs across app & web. View plans

Welcome to ChemPriceHub

 
Home > News > How is Raney nickel prepared, and what safety precautions are essential during i...

How is Raney nickel prepared, and what safety precautions are essential during its production?

Olivier Dupont
Published on 2026-08-05

How is Raney nickel prepared, and what safety precautions are essential during its production?
Raney nickel production starts with melting nickel and aluminum in a 1:1 mass ratio, followed by quenching and pulverizing into fine particles. The alloy is then treated with concentrated sodium hydroxide, which dissolves aluminum and leaves behind a porous nickel skeleton with surface areas reaching 100-150 m²/g. The NiAl phase resists leaching, so reaction time, alkali concentration, and temperature critically determine final pore structure and catalytic activity. Safety is a major concern: dry Raney nickel is pyrophoric and rarely sold in that form. Commercial grades are typically supplied water-wet to reduce risk, and water does not interfere with most hydrogenation reactions. Some stabilized grades contain activated carbon, appearing black, which improves safety but still requires careful handling.

Comments

0
  • Daniel Foster 2026-08-06 08:22
    For buyers, note that the 1:1 Ni/Al ratio remains the industry benchmark because it optimizes the leaching behavior and final activity. When sourcing, always confirm the wetting agent and storage conditions—improper handling during transport or storage can lead to spontaneous ignition. Also, verify the supplier's activation procedure, as inconsistent alkali treatment between batches is a common source of performance variability.
No comments yet.