| Region | Enterprise Name | Capacity (10,000 tons/year) | Unit Status |
|---|---|---|---|
| Northeast | Hangjin Technology | 12 | On September 10, a small unit malfunctioned; half-load maintenance for at least one week; the large unit is normal. |
| North China | Tianjin Bohua | 20 | Unit operating at 90% load. |
| Tianjin Petrochemical | 15 | Unit operating at about 70% load. | |
| Shandong | Shandong Befar | 28 | Unit operating normally at full load. |
| Shandong Xinyue | 30 | Unit operating at about 80% load, with plans to gradually increase load. | |
| Shida Shenghua | 7 | Unit operating normally at full load. | |
| Wanhua Chemical | 154 | Units in Phases 1–4 operating at slightly reduced load. | |
| Shandong Jinling | 16 | Unit operating normally at full load. | |
| Shandong Sanyue | 32 | Unit operating normally at full load. | |
| Dongying Huatai | 8 | Unit operating normally at full load. | |
| Zhonghai Fine Chemical | 8 | Unit shut down. | |
| Qixiang Tengda | 30 | Unit shut down for maintenance; may restart successively in early September; specific timing to be determined. | |
| Jincheng Petrochemical | 30 | Unit shut down. | |
| Lihuayi Weiyuan | 30 | Unit operating normally at full load. | |
| Binhua New Materials | 24 | Unit operating at 80% load. | |
| Minxiang Chemical | 15 | Unit shut down on February 13, 2026; restart time to be determined. | |
| Dongming Guoen | 8 | Unit shut down on December 21, 2025; restart time to be determined. | |
| Levima Green | 30 | Since August 29, the unit has gradually increased load to 70–80%; after a short shutdown this week, it has resumed operation at about 50% load. | |
| East China | Jinling Huntsman | 24 | Unit operating at about 80% load. |
| Ningbo Haian | 57 | Phase I unit operating at 70% load; Phase II unit shut down for maintenance on September 24, 2025. | |
| Zhenhai Refining & Chemical | 30 | Unit operating at 70% load. | |
| Hongbaoli | 16 | Unit shut down. | |
| Jiangsu Fuqiang | 10 | Unit shut down; restart time to be determined. | |
| Taixing Yida | 15 | Unit operating at about 50% load. | |
| Jiahong New Materials | 40 | Unit shut down for maintenance on August 10; restarting successively this week; a small amount of product has been produced but not yet sold externally. | |
| Zhejiang Petrochemical | 27 | Unit operating at 60–70% load. | |
| Ruiheng New Materials | 40 | Unit operating at about 40–50% load. | |
| Shenghong Petrochemical | 20 | Unit shut down for maintenance on May 28; restart expected possibly in October. | |
| South China | Sinochem Quanzhou | 20 | Unit operating at 90% load. |
| Guangxi Petrochemical | 27 | Unit operating at 60% load. | |
| Central China | Sinopec Changling | 10 | Unit operating normally at full load. |
Data source: Chempricehub Information.