| Region | Plant | Capacity (10k tons) | Remarks |
|---|---|---|---|
| Jiangsu | Nanjing Chemical | 26 | Unit 1 (230k tpa): ~80% load; Unit 2 (100k tpa): fluctuating load, shutdown expected soon |
| Jiangsu Fuqiang | 10 | Maintenance: Nov 15 – Nov 25 | |
| Jiangsu Yangnong | 3 | Operating normally | |
| Shandong | Yantai Wanhua | 108 | Operating normally |
| Shandong Jinling | 26 | New Materials Div.: Unit 1 (100k tpa) operating normally; Unit 2 (100k tpa) shut down from Sep 28 to Nov 15 | |
| Dawang Unit: Operating normally | |||
| Shandong Huatai | 10 | Operating normally | |
| Dongying Caijin Chemical | 6 | Shut down | |
| Jilin | Jilin Xuyang Kainuier | 36 | Two units at ~80% load |
| Shanxi | Tianji Chemical | 26 | Operating normally |
| Chongqing | BASF Chongqing | 30 | Operating normally |
| Chongqing Changfeng | 3.7 | Operating normally | |
| Zhejiang | Ningbo Wanhua | 72 | Operating normally |
| Shanghai | Covestro Shanghai | 40 | Operating normally |
| BASF Shanghai (Lianheng) | 18 | Operating normally | |
| Fujian | Fujian Wanhua | 72 | Operating normally |
Comments
0